Skip to content
Les Courtiers en transport GMR
FR/EN Request a Quote Talk to a GMR Advisor
Multi-site · oversized · high value

Complex Projects

Synchronizing several shipments, sites, suppliers or stages, and finding the right equipment when dimensions, value or handling complicate the move.

A building wall opened across its full width to bring out an oversized piece wrapped in blue, two workers in front of the opening.
Talk to a GMR Advisor 1 800 363-1159 · gmr@gmrtransport.com Or describe what you need: request a quote.

The problem, from your perspective. The GMR answer

A transportation project is rarely one truck: it is a sequence. And every unclear handoff creates delay, cost and risk.

  1. The problem, from your perspective. Vague or incorrect dimensions and weights No way to optimize the number of trucks and no way to choose the right equipment.
    The GMR answer. The on-site assessment We go onsite for a full assessment of the needs or for the execution of the contract: clearances, access, handling, sequence.
  2. The problem, from your perspective. Wrong or missing documentation When the volume increases, the documentation may no longer keep pace with the project.
    The GMR answer. All of the project or part of it We manage your project according to your needs: we coordinate all or part of it, depending on the need.
  3. The problem, from your perspective. A reaction time that is too slow Incidents, delays or errors handled too late: the waiting charges add up.
    The GMR answer. Proactive detection Risks are identified earlier, which improves reaction time and helps to limit additional costs.

The limits, stated frankly

  • Oversized moves call for permits, escorts or special arrangements: those constraints are included in our quote, never improvised.
Case study

A 28-foot-diameter prototype, slid into place

When a Texas client and an Alberta firm tasked us with moving a one-of-a-kind, 28-foot (8.5 m) prototype built in Trois-Rivières, everything was lined up for shipment via the Port of Trois-Rivières, until the project was put on hold at the last minute. Thinking fast, we found a warehouse owner willing to open up 40 feet of his building's front, then moved and stored the massive piece via hydraulic skidding. Result: prototype safely set in place with zero damage.

Tell us about the shipment that takes up most of your time.

An advisor who knows your file, not a queue.